Ops Shift Log: 03/27/2019, Owl Shift 07:00 – 15:00 (00:00 - 08:00) Time - UTC (PT)
State of H1: Locked at NLN, range = 108.0Mpc at 35.2w
Intent Bit: Observing
Support: N/A
Incoming Operator: Niko
Shift Summary: Dropped out of Observing to manually damp Violin Mode-9. Back to Observing after restarting Guardian Damping and accepting SDF Diffs.
Lockloss due to LSC Servo Board Split Voltage is High
Relock at NLN, accept SDF Diffs and back into Observing
Lockloss – Unknown
Down while relocking due to LSC Servo Board Split Voltage High
Relocked at NLN, cleared SDF Diff, and back into Observing
Activity Log: Time - UTC (PT)
07:00 (00:00) Take over from Patrick
08:41 (01:41) Out of Observing to Damp Violin Mode-9
08:42 (01:42) Craig – Running PCal & DARM injections
08:49 (01:49) Craig – Finished running injections
08:58 (01:58) Back to Observing
10:31 (03:31) Lockloss – LSC Servo Board Split Voltage is High
11:59 (04:59) Relocked at NLN
12:10 (05:10) Cleared SDF differences & back into Observing
12:13 (05:13) LockLoss – Unknown
13:00 (06:00) Relocked at NLN
13:03 (06:03) Cleared SDF differences & back into Observing
15:00 (08:00) Turn over Niko