Randy, Mick, Mark, Chris & Zack Pretty Straight forward here. Flew Support Table Over Chamber, lowered into cleanroom. Hovered over the Support Tubes, bolted up, dropped load, torqued bolts. Jacked Support Tubes up into V-Blocks and clamped tubes to blocks. Removed Support Table. Apollo crew will conclude the job this afternoon with a bit of hardware removal. Nice work guys--H Couple photos, Zack & Mick.