Reports until 11:04, Tuesday 02 April 2019
H1 PSL
jason.oberling@LIGO.ORG - posted 11:04, Tuesday 02 April 2019 (48152)
PSL Work Today (WP 8148 and FAMIS 10704)

J. Oberling, E. Merilh

FSS RefCav Beam Alignment Tweak (WP 8148)

Ed tweaked the beam alignment into the FSS RefCav this morning.  When we started the TPD voltage was ~3.1V, when complete the TPD was ~4.2V.  This closes LHO WP 8148.

PSL Power Watchdog Reset (FAMIS 10704)

Both PSL power watchdogs were reset at 17:54 UTC (10:54 PDT).  This completes FAMIS 10704.