Reports until 11:22, Tuesday 02 April 2019
H1 CDS
filiberto.clara@LIGO.ORG - posted 11:22, Tuesday 02 April 2019 (48155)
New UPS Installed for CER Network Switch

WP 8105

Installed new UPS in the CER mezzanine. Unit was left powered off. Cabling to the CER network switch still needs to be terminated.