17:24 Lockloss
EARTH_QUAKE SEI_CONF was engaged minutes before without breaking the lock. ADS line were adjusted by commissioners, simultaneously, which will need to probably be integrated into the ISI transitioning processes. the Transition didn't blow the lock but the EQ motion coupled with 90%ile uSei was to much for "her". Observation mods was set to Environment/Earthquake and will remain there until re-lock is acquired and intention bit is set, barring any opportunistic commissioning that might take place while Livingston is down.