[Mark B, Stuart A] Ref: WP#3588 PR2 is being used overnight, testing the functionality of automated testing scripts (TF's and Power Spectra), following the recent SUS infrastructure and CDS updates. The measurement status indicator will be ON, however, the Master Switch will remain OFF for the duration of the tests (i.e. no excitations will get though to the optic). I will update the log when the measurements are complete and damping loops are re-established.