PR3 status

After Mark had calculated and loaded the offsets and gains, I entered the cleanroom and set the M1 stage BOSEMs to 50% OLV.  We should be ready to run a set of TFs to check it's post-move health in preparation for glass install early next week.  We'll continue to investigate the M3 UL issue thereafter. Status: suspended, covered, and ready for M1 level TFs.