TITLE: 04/09 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: TJ
SHIFT SUMMARY: It has been a fairly typical (unfortunately) maintenance day and recovery. Locking efforts after noon were stymied by IMC locking issues which have since been resolved, an EQ that arrived right around the same time as recovery was to begin, and SRC ALIGN issues that Sheila tracked down to a mysterious offset change in the POP signal used for triggering. Winds are in the 40 mph range which isn't helping. Have made it briefly to NLN, but lost lock before any SDF cleanup or LVEA sweeps could be completed.
LOG:
15:02 Daniel to LVEA for SQZ work
15:18 Chris to all end and mid stations for maintenance checks
15:24 Gerardo to both ends for property inventory
15:29 Ed to EY to center Oplevs, Chandra to LVEA measuring chilled water temp, Fil to CER AI chassis work
15:30 Dick to CER RF investigations
15:31 Betsy, Nichole, Christina, Elizabeth to LVEA for 3IFO inventory
15:34 Richard back from EY, Niko and Sharan to EY PCal work
15:34 Bubba to both ends hanging AEDs, Peter to optics lab
15:41 Jason adjusting PSL FE diode current
15:41 Richard to CER
15:49 Niko and Sharan back
16:05 Marc to SQZ bay for AOM swap
16:27 Jeff B both ends swapping in-chamber booties
16:29 Bubba back from ends, to LVEA
16:30 Ed back
16:31 Jason done
16:42 Ed to LVEA centering Oplevs
16:44 Chandra to MY
16:50 Cheryl to LVEA labeling 3IFO equipment
17:13 Hugh to LVEA
17:13 Richard to EY
17:22 Niko and Sharan to EY for PCal meas.
17:25 Chandra back
17:28 JeffB to LVEA
17:30 Ed out
17:31 EY to laser hazard, Richard back
17:39 Cheryl out
17:41 Cheryl to MY
18:13 JeffB done
18:16 Ed to EX
18:31 Marc out
18:40 Ed back
18:44 Georgia and Danny to CO2Y
18:45 Cheryl back
18:52 Patrick to MY
19:26 Patrick back
20:22 Dick and Marc out
20:28 Patrick to MY
20:48 Patrick back
21:39 Kyle to MY
21:53 Daniel and Nutsinee out
22:05 Kyle back
22:30 Betsy and Nichole to MY