Today the X-Mid crane was used to remove four HEPTA pumps from their wooden crates.
There was two periods of activity with a break in between. All times below are UTC.
The crane was used during the following times:
- start 21:28 stop 21:37
- start 21:51 stop 21:56
- start 23:55 stop 00:02
- start 00:05 stop 00:10
- start 00:25 stop 00:33 and crane was parked.
Also a drill was used to remove the screws from the wooden crates, sometimes it made some noise, times are as follows:
- start 21:10 stop 21:22
- start 21:39 stop 21:50
- start 23:22 stop 23:55
Work done under WP 8162.