TITLE: 04/15 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 107Mpc
INCOMING OPERATOR: Patrick
SHIFT SUMMARY:
6.5hrs of OBSERVING this shift, and then ~4hrs of Approved Commissioning (TCS OMC scans) started at the end of shift and will carry over to the evening.
LOG:
My Locking Notes: DRMI alignment tweaking & OMC Carrier
1) If dropping out in steps between DRMI & DC Readout, tweak up alignment by stopping at CHECK_AS_SHUTTERS, and then: tweak PRM & SRM to get POP18 up to 60 & POP90 down to 15. (Thanks to Jenne for the reminder she's told me several times before!) :)
2) If one gets a message for the OMC not finding the carrier, one can not do anything and wait for the 600sec sleep for ISC_LOCK, or open up the OMC_LOCK node and request FIND_CARRIER (it'll go DOWN & then find the carrier). One can do this request eventhough this node is managed.