Reports until 16:01, Tuesday 16 April 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:01, Tuesday 16 April 2019 (48556)
Ops Day SHift Summary
Ops Shift Log: 04/16/2019, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN
Intent Bit: Observing
Support: N/A
Incoming Operator: Patrick
Shift Summary: Took the IFO down at the start of the maintenance window. After window, ran an Initial Alignment. SRC_ALIGN struggled a bit, and Jenne dressed it up. Locking went smoothly. Held off going into Observing while PEM injections and Calibration work completed. Into Observing at 21:02 (14:02). Turning over to Patrick.   
 
Activity Log: Time - UTC (PT)
14:50 (07:50) Porta-Potti service on site
14:55 (07:55) Bubba – Setting up for Variac install in Mechanical building (WP #8175)
14:59 (07:59) Karen – Going to End-Y
15:00 (08:00) Take over from Niko
15:01 (08:01) Vanessa – Going to End-X and Mid-X
15:17 (08:17) Desert Green on site
15:18 (08:18) Danny – Adding and adjusting TCS-Y Laser mask (WP #8170)
15:21 (08:21) Hugh – Going to both ends for HEPI work
15:23 (08:23) Richard – Working on SQZ DAC
15:30 (08:30) Peter – Going into Optics Lab
15:27 (08:27) Took IFO to DOWN
15:43 (08:43) Marc – Work on ASC_REFL_A_RF454 readback problem (WP #8171)
15:54 (08:54) Sheila – Going to Squeezer area to work on laser
15:54 (08:54) Hugh – Back from end stations
15:55 (08:55) UniFirst – On site to service mats
16:02 (09:02) Norco – Delivering N2 to CP5
16:15 (09:15) Richard – Finished with SQZ DAC work
16:15 (09:15) Richard – Hunting for ISC & SQZ grounds around HAM6 (WP #8169)
16:18 (09:18) Kyle & Gerardo – Visual gate valve inspection (WP #8167)
16:28 (09:28) Vanessa – Finished at End-X and Mid-X
16:28 (09:28) Vanessa – Going into the LVEA
16:37 (09:37) Karen – Finished at End-Y
16:44 (09:44) Robert & Phillippe – Going into the LVEA to place PEM equipment
16:55 (09:55) Tour in CR
17:10 (10:10) Peter – Out of Optics Lab
17:15 (10:15) Tour out of CR
17:17 (10:17) Danny – Out of LVEA
17:50 (10:50) Filiberto – At End-Y to terminate cables  
17:55 (10:55) Dave – DAQ restart
18:05 (11:05) Dave – DAQ restart
18:07 (11:07) Richard – Out of LVEA
18:13 (11:13) Kyle & Gerardo – Finished inspecting gate valves MY, EY, MX
18:32 (11:32) Robert – Going to End-Y to place PEM equipment
18:35 (11:35) Kyle & Gerardo – Finished at EX – Finished with GV inspection
18:39 (11:39) Karen – Going to End-Y to drop off supplies – Not going into VEA
18:48 (11:48) Filiberto – Finished at End-Y
18:51 (11:51) Start Initial Alignment
19:22 (12:22) Corey – Finished with End-X sweep
19:27 (12:27) Jason – In Optics Lab checking inventory
19:33 (12:33) Jason – Out of Optics Lab
19:46 (12:46) Drink service on site
19:50 (12:50) Finished Initial Alignment
19:51 (12:51) Start Locking
20:05 (13:05) Corey – Finished sweep of LVEA
20:10 (13:10) Robert – Sweep of End-Y
20:18 (13:18) Robert - Back from End-Y
20:35 (13:35) Locked at NLN – PEM injections and CAL work
21:02 (14:02) Into Observing
23:00 (16:00) Turn over to Patrick