Reports until 16:02, Thursday 18 April 2019
H1 AOS
jeffrey.bartlett@LIGO.ORG - posted 16:02, Thursday 18 April 2019 (48599)
Ops Day Shift Summary
Ops Shift Log: 04/18/2019, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN
Intent Bit: Commissioning
Support: N/A
Incoming Operator: Patrick
Shift Summary: After initial alignment, relocked the IFO post M6.5 earthquake. Since LLO was down due to heavy weather moving through the southeast when the IFO was back at NLN, turned the IFO over to commissioning for PEM injections.
There was a Hanford shelter in place drill for the 100 & 200 area. Took the opportunity to review and update the operators Site Emergency Plan documents book.   
 
Activity Log: Time - UTC (PT)
15:00 (08:00) Take over from Niko
15:25 (08:25) Switched the SEI_CONF EARTHQUAKE mode for incoming mag 6.5 earthquake
15:27 (08:27) ISC_LOCK to EARTHQUAKE
15:31 (08:31) Lockloss – Earthquake
15:37 (08:37) Christina – Going to both mid stations for inventory
15:44 (08:44) Peter – Into Optics Lab
15:47 (08:47) Christina – Back from mid stations
16:07 (09:07) Richard – Into the LVEA to recover equipment
16:12 (09:12) Richard – Out of LVEA
16:20 (09:20) Back to WINDY as things settle down from earthquake
16:31 (09:31) Unsuccessful at locking Y-Arm ALS - Start Initial Alignment
17:05 (10:05) Karen – Going to Mid-Y
17:14 (10:14) Finished with Initial Alignment – Start locking
17:15 (10:15) Karen – Back from Mid-Y
17:47 (10:47) Christina – Going to both mid stations for inventory
17:55 (10:55) Locked at NLN, 35.4w, 109.2Mpc
17:56 (10:56) Turn IFO over to Robert for PEM injections (LLO down due to storms)
18:40 (11:40) Corey – Going to Mid-Y
18:45 (11:45) Peter – Out of the Optics Lab
19:00 (12:00) Corey – Back from Mid-Y
19:02 (12:02) Robert, Phillippe, Sharan - Going into LVEA for PEM injections
19:38 (12:38) DRILL – Take cover drill message from Hanford for areas 100 & 200
20:06 (13:06) DRILL – Take cover drill concluded message from Hanford
23:00 (16:00) Turn over to Patrick