Reports until 07:56, Friday 19 April 2019
LHO General
thomas.shaffer@LIGO.ORG - posted 07:56, Friday 19 April 2019 (48609)
Ops Owl Shift Summary

TITLE: 04/19 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 109Mpc
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: 21 hour lock. The only issue I had was when the squeezer lost lock, The SQZ_LO_LR node was stuck in LOCKING_OMC state because the beam diverter was closed. It looks like the manager is supposed to open it, but it wasn't doing anything. I manually opened it and then it advanced on.
LOG: