Here are notes for transition to EARTHQUAKE state tonight. Took an overview screenshot of various windows when I transitioned (attachement #1). Here are the notes:
- Around 5:40 noticed EQ on USGS page...
- 5:43 Received Verbal Alarm for incoming EQ
- 5:58 Received 2nd verbal for EQ
- Got everything set up for transitioning: Looking at PeakMon ndscope, Striptool on ISI_CONFIG, and the wall monitor.
- SEISMON EQ Response script was on the border of EARTHQUAKE and LARGE_EARTHQUAKE. (attachement #2)
- 5:51 Noticed small steps on ndscope
- 5:50 All three seismometers appear to be increasing (attachement #3)
- 5:53 NLN
- 5:56 PEM Injection team goes into LVEA
- 6:03 Noticed large oscillation on striptool for the CPS.
- 6:03 Transitioned ISC_LOCK to EARTHQUAKE (this increases the ADS Lines...which are around 20Hz).
- 6:03:54 Transitioned ISI_CONFIG to EARTHQUAKE---completed at 6:04:13
- H1 remained locked. Range hovering around 100Mpc, but with glitches (from EQ state...or more likely PEM injections).
- 6:23 Peak signal on ndscope of 2500.
- 6:25 Peak signal (i.e.1200nm/s) on ISI_config blrms striptool
- 6:27 nuc5 0.03-0.1 band now hit 1um/s
- 6:27 Seismon goes orange (100 sec until R3.5 wave arrival!)
- 6:29 Peak signal on nuc5 0.03-0.1 band now hit 2.5 um/s
- 6:33 ISI_Config CPS goes beyond 2000nm!
- 6:40 VERBAL for EX & huge glitch.
- 6:45 back to WINDY for ISI_CONFIG
- 6:49 back to NLN for ISC_LOCK
- Attachment #4 is screenshot during peak seismic activity. (Ed's walked in and for his big Philippine EQ at ~9:15utc last night he said he just rode it out...mine is only slightly higher for comparison)
- PEM Injection crew still out on the floor