TITLE: 04/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Patrick is covering OPS 3PM-4PM local (22:00-23:00 UTC) then Corey
SHIFT SUMMARY: H1 is in NLN, commissioning
LOG:
- 25-04-19 17:21 Kyle to MY to test some switches
- 25-04-19 17:21 ChrisS and Ken to the top of the air handler in the Mechanical room
- 25-04-19 17:22 Tour in the Control Room
- 25-04-19 19:39 Robert to HAM6 to take pictures
- 25-04-19 21:07 Craig to LVEA to the PSL racks
- 25-04-19 21:08 Kyle to MX and then MY
Currently On Site / at MX/MY / in LVEA / taking measurements:
- Kyle at MX
- Ken (electrical) Mechanical room / Air Handlers
- Robert and Sharan in the LVEA
- Craig in the LVEA
- Nutsinee - SQZ
- Jenne and Sheila - A2L
- H1 is in NLN