Ops Shift Transition: 04/28/2019, Day Shift 15:00 – 23:00 (08:00 -16:00) - UTC (PT)
State of H1: Initial Alignment
Intent Bit: Commissioning
Weather: 15 mph wind, light cloud cover
Primary 0.03 – 0.1Hz: 0.01 um/s in Z-axis, X and Y still rung up from wind
Secondary 0.1 – 0.3Hz: 0.1 um/s
Outgoing Operator: Jeff
Quick Summary: Been out of lock for ~21 hours, initially due to high wind but now there are issues with ASC signals not converging and not being able to reach PRC_ALIGN in initial alignment. This carries over to normal locking, where PRMI_LOCKED could not be achieved.