Reports until 08:25, Sunday 28 April 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:25, Sunday 28 April 2019 (48830)
Ops Owl Shift Summary
Ops Shift Log: 04/28/2019, Owl Shift 07:00 – 15:00 (00:00 - 08:00) Time - UTC (PT)
State of H1: Unlocked
Intent Bit: Locking
Support: N/A
Incoming Operator: Niko
Shift Summary: IFO was unlocked due to high winds from the previous evening. Tried relocking and Initial Alignment several times (see times is Activity Log).
Same results despite trying several different alignments tweaks and adjustments.
Summary of Issues:
(1). Could not offload Green WFS as ALS_(X/Y)_WFS_DOF_2_(P/Y)_OUTPUT are not converging. Skipping the offload step a couple of times made no difference. Alignment and locking of GREEN was not a problem.
(2). Skipped GREEN_WFS_OFFLOADED and went on with Initial Alignment
(3). Stuck on PRC_ALIGN no amount tweaking made progress
(4). Skipped PRC_ALIGN and completed Initial Alignment
(5). Tried Relocking
(6). SRM WD tripped – Reset and continued
(7). Still could not get past AQUIRE_DRMI_1F
      Tried several tweaks to no avail
      CHECK_MICH_FRINGES tuned the AS spot to dark but spot looked a bit funky
      Could not get past AQUIRE_PRMI  
(8). Went back to Initial Alignment – to wait for morning support  
 
Activity Log: Time - UTC (PT)
07:00 (00:00) Take over from Patrick
07:12 (00:12) Start relocking – Not past AQUIRE_DRMI-1F
07:55 (00:55) Start Initial Alignment
                       Stuck on GREEN_WFS_OFFLOADED
09:04 (02:04) Start Initial Alignment
09:20 (02:20) Stuck on GREEN_WFS_OFFLOADED – Skipped and moved on
                       Stuck on PRC_ALIGN
10:05 (03:05) Start Initial Alignment
                       Skip PRC_ALIGN and complete rest of Initial Alignment
12:41 (05:41) Tried Relocking
12:43 (05:43) SRM WD tripped
15:00 (08:00) Turn over to Niko