Reports until 11:55, Tuesday 30 April 2019
H1 PSL
jason.oberling@LIGO.ORG - posted 11:55, Tuesday 30 April 2019 - last comment - 08:50, Friday 03 May 2019(48871)
PSL Work Today (WP 8188 & FAMIS 10708)

WP 8188

I made I slight adjustment to the light level on the PMC locking PD to hopefully alleviate the constant increase in the relock counter we've been seeing lately (LHO alog 48568 & FRS 12753).  I began by tweaking the alignment into the PMC locking PD, which did not change the PD voltage.  I then slightly tweaked the TFP directly in front of the PD to increase the PD voltage; this had a small effect on the PD voltage.  The changes are:

I did not change the PMC gain.  I reset the PMC relock counter at 18:44 UTC (11:44 PDT) and will monitor this over the next few days before closing the work permit.

FAMIS 10708

Both PSL power watchdogs were reset at 18:35 UTC (11:35 PDT).  This completes FAMIS 10708.

Other Work

I happened to notice that the ISS diffraction % was at ~1.7% with the just the 1st loop locked; the diffracted power should be between 2% and 3%.  I changed the ISS Reference Signal from -2.08 V to -2.07 V; this brought the diffraction % to ~2.1%.  The change was accepted in both the SAFE and OBSERVE SDF files.

Comments related to this report
jason.oberling@LIGO.ORG - 08:50, Friday 03 May 2019 (48961)

In almost 3 days there have been 0 relocks on the PMC, see attached.  Increasing the light level on the diode cured the behavior.  This closes WP 8188 and FRS 12753.

Images attached to this comment