Two cleanings of the chamber and cleanroom took place this morning. The garbing/staging cleanroom was removed from the e-module and placed near HAM9. The door was removed from the chamber this afternoon and the g/s cleanroom re-located to the west side of the chamber cleanroom. The CDI (contamination/dust investigation) kit arrived today. As required by procedure E1201096-v3, a couple of items were taken to clean and bake. They should be ready tomorrow morning.