Reports until 00:13, Thursday 02 May 2019
LHO General
corey.gray@LIGO.ORG - posted 00:13, Thursday 02 May 2019 (48913)
Transition to OWL Log

TITLE: 05/02 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Jeff
CURRENT ENVIRONMENT:
    Wind: 18mph Gusts, 14mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.10 μm/s

Microseism well below 50th percentile with slight breezes.
QUICK SUMMARY:

Got the handoff from Jeff.  H1 had just had a lockloss and I will be working on that ASAP.  H1CALINJ has a RED indicator and this is due to an INJECTION issue ("Hardware Injections stopped").

NOTE:  BOTH ALSx & y have notifications of fiber polarization greater than 20% (I remember one of the [x?] seems to always be near there & can't be improved from the Control Room).  ALSy has not been locking for Jeff, perhaps this is a reason.  Will investigate this.