Reports until 10:29, Friday 03 May 2019
H1 ISC
thomas.shaffer@LIGO.ORG - posted 10:29, Friday 03 May 2019 (48962)
EY ASC TR B SEG1 railed after 18 hours in lock

Dave pointed this out. It seems that the segment 1 of the EY ASC TR B QPD railed after 18hours of the current lock. I'm guessing that we aren't using this PD during the lock, but there is a clear drift to its rail/saturation point. Trending a bit back, there are a few small times that will saturate, but nothing for this amount of time (going on ~7 hrs at this point).

I attached a trend of this lock with all four quadrants. I guess the other odd bit is that SEG3 has drifted to near 0, so we must be moving off this PD.

Might be nothing, but worth noting here.

Images attached to this report