Ops Shift Transition: 05/06/2019, Day Shift 23:00 – 7:00 (16:00 -00:00) - UTC (PT)
State of H1: Down
Intent Bit: Commissioning
Weather: Low wind, sunny
Primary 0.03 – 0.1Hz: ~1 um/s, rung up from a 7.2 magnitude earthquake near Papua New Guinea
Secondary 0.1 – 0.3Hz: 0.1 um/s
Outgoing Operator: Ed
Quick Summary: Waiting for earthquake to ring down before we re-lock