Reports until 16:05, Monday 06 May 2019
H1 General
yannick.lecoeuche@LIGO.ORG - posted 16:05, Monday 06 May 2019 (49044)
Ops EVE Shift Transition

Ops Shift Transition: 05/06/2019, Day Shift 23:00 – 7:00 (16:00 -00:00) - UTC (PT)

State of H1: Down

Intent Bit: Commissioning

Weather: Low wind, sunny

Primary 0.03 – 0.1Hz: ~1 um/s, rung up from a 7.2 magnitude earthquake near Papua New Guinea

Secondary 0.1 – 0.3Hz: 0.1 um/s

Outgoing Operator: Ed

Quick Summary: Waiting for earthquake to ring down before we re-lock