Ops Shift Transition: 05/07/2019, Day Shift 15:00 – 23:00 (08:00 -16:00) - UTC (PT)
State of H1: Locked
Intent Bit: Maintenance
Weather: Clear, no rain, and warming. Summer is on the horizon
Primary 0.03 – 0.1Hz: 0.05um/s
Secondary 0.1 – 0.3Hz: 0.7mu/s
Outgoing Operator: Corey
Quick Summary: IFO is still locked – Site is starting Tuesday Maintenance window.