Ops Shift Log: 05/07/2019, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN
Intent Bit: Observing
Support: Jenne
Incoming Operator: Niko
Shift Summary: IFO is locked at NLN, with a range of 114.3Mpc. Did an Initial Alignment after the maintenance window and relocked the IFO with relative little trouble. Daniel and Jenne were taking measurements after the IFO was relocked. When they finished went into Observing.
Activity Log: Time - UTC (PT)
15:00 (08:00) Take over from Corey
15:00 (08:00) Chris – Trailering snorkel lift to End-X
15:00 (08:00) Karen – Going to End-Y
15:05 (08:05) Set SEI_CONF to SC_OFF_NOBRSXY
15:07 (08:07) Fire System Maintenance on site
15:09 (08:09) Vanessa – Going to End-X
15:13 (08:13) Marc & Dick – Going to ISC racks (WP #8200)
15:19 (08:19) Ace Service – On site to service Port-a-potty
15:20 (08:20) Lock loss – Maintenance
15:21 (08:21) Daniel – Into LVEA
15:25 (08:25) Jason – Tweaking Ref Cavity beam alignment
15:26 (08:26 Fire Systems Maintenance on site
15:28 (08:28) Run S_A_36 rephasing command
15:30 (08:30) Rahul – Running charge measurements
15:37 (08:37) Jason – Finished with PSL Ref Cavity beam alignment
15:40 (08:40) Norco – On site with N2 delivery to CP7 and CP1
15:52 (08:52) Chris – Escorting the pest control folks around the site
15:53 (08:53) Richard & Filiberto – Going to End-X to 60Hz noise and grounding
15:55 (08:55) Christina – Going to End-X for inventory tagging
15:58 (08:58) Carols – Rebooting H1DIGIVIDEO2
16:00 (09:00) Karen – Finished at End-Y
16:03 (09:03) Hugh & Chandra – Going into LVEA
16:05 (09:05) Jason & Cheryl – Going into the PSL (WP #8201 & WP #8202)
16:07 (09:07) Peter – Going into Optics Lab
16:19 (09:19) Fire systems Maintenance – Going to End-X for fire system checks
16:25 (09:25) Hugh & Chandra – Out of the LVEA
16:35 (09:35) Christina – Back from End-X – Going into the LVEA
16:37 (09:37) Amber – Escorting visitor through the LVEA
16:40 (09:40) Hugh – Going to both end stations for Dust Monitors and HEPI checks
16:42 (09:42) Jeff & Charlie – Going into the LVEA for safety checks
16:55 (09:55) Richard & Filiberto – Back from End-X
16:57 (09:57) Amber – Out of the LVEA
17:01 (10:01) Rick and Fellows – Going into the LVEA to recover equipment and do a brief tour
17:05 (10:05) GRB – Ignored, IFO down for maintenance
17:09 (10:09) Paradise Water – On site to service bottled water
17:14 (10:14) Filiberto – Going into the LVEA to assist Daniel with table power
17:15 (10:15) Vanessa – Finished at End-X
17:15 (10:15) Vanessa – Going into the LVEA
17:19 (10:19) Filiberto – Out of the LVEA
17:30 (10:30) Cheryl – Taking MC to high power – Have misaligned PRM and SRM
17:32 (10:32) Filiberto & Carlos – Going into the LVEA to check camera wiring
17:38 (10:38) Christina – Out of the LVEA
17:38 (10:38) Christina – Going down Y-Arm to check on Norco deliveries
17:54 (10:54) Pest Control – Finished and leaving the site
17:57 (10:57) Carlos – Out of the LVEA
18:02 (11:02) Filiberto – Out of the LVEA
18:03 (11:03) Hugh – Going into the LVEA to look for hardware
18:11 (11:11) Hugh – Out of the LVEA
18:12 (11:12) Rick & Fellows – Out of the LVEA
18:19 (11:19) Jason & Cheryl – Out of the PSL Enclosure
19:15 (12:15) Set SEI_CONF to WINDY
19:35 (12:35) Start Initial Alignment
20:22 (13:22) Start Relocking
20:51 (13:51) Richard – In LVEA to check on cameras
20:52 (13:52) Jeff K. & Dr. Levesque – Going up to observation deck
20:58 (13:58) Jeff K & Dr. Levesque – Back from observation deck
21:05 (14:05) Richard – Out of the LVEA
21:34 (14:34) Relocked at NLN
21:50 (14:50) Jenne & Daniel – Into LVEA to run some measurements
22:07 (15:07) Back into Observing
23:00 (16:00) Turn over to Niko