Reports until 08:14, Wednesday 08 May 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:14, Wednesday 08 May 2019 (49108)
Ops Day Shift Transition
Ops Shift Transition: 05/08/2019, Day Shift 15:00 – 23:00 (08:00 -16:00) - UTC (PT)
State of H1: Unlocked – Recovering from Dolphin crash
Intent Bit: Corrective Maintenance
Weather: Partly cloudy, no rain forecast. Winds are Calm with temps in the low 60s to low 80s
Primary 0.03 – 0.1Hz: 0.03um/s – Ringing down from earthquake
Secondary 0.1 – 0.3Hz: 0.05mu/s
Outgoing Operator: Corey
Quick Summary: IFO is relocking after recovery from Dolphin crash at the start of the Owl shift.