Reports until 16:08, Wednesday 15 May 2019
H1 General
yannick.lecoeuche@LIGO.ORG - posted 16:08, Wednesday 15 May 2019 (49269)
Ops EVE Shift Transition

Ops Shift Transition: 05/15/2019, Eve Shift 23:00 – 7:00 (16:00-00:00) - UTC (PT)

State of H1: Locking

Intent Bit: Commissioning

Weather: ~10 mph wind, cloudy

Primary 0.03 – 0.1Hz: 0.02 um/s

Secondary 0.1 – 0.3Hz: 0.1 um/s

Outgoing Operator: Corey

Quick Summary: Re-locking after dropping out from REDUCE_RF9_MODULATION_DEPTH. Commissioning work going on at 40W.