TITLE: 05/16 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ed
SHIFT SUMMARY:
Troubleshooting was the focus in the morning (Betsy on IMC & Sheila on ASC). Since thinking about any hardware changes since Maintenance Day, Sheila & Marc went to check baluns (no issue there). Ultimately, Sheila (& Keita later joining her) was able to get h1 back to NLN by focusing on ASC. We've been locked for all of the second part of the shift.
NOTE: See Sheila's alog about how to handle H1 if you have trouble after a lockloss.
LOG:
- H1 in the DOWN/READY state at beginning of shift. Started locking, but really waiting for the calvary, Sheila!
- 16:49 Transitioned SEI_CONF to EARTHQUAKE (I was a little late on this, since focused on H1 issues. But able to stay around DC Readout for Sheila's ASC work).
- 17:07 Transitioned back to WINDY
- This was a 5.8 from El Salvador
- 19:56 Back to OBSERVING!
- 21:20-21:48 Heavy rainstorm begins!
- 21:18 Dave noticed a Slow Controls RED hardware/sensor alert on the CDS Overview
- This was due to a sensor on the wind fence. It doesn't affect H1, so will live with this on the CDS Overview until we can head out to EX.
- 21:30 GRB (talked with LLO)
- 21:36-22:41 MY cable pulling Gerardo & Fil
- 22:22 - 22:26 Out of OBSERVING: Due to Squeezer SHG PZT hit its rail at 0. It came back on its own!
- Handing off to Ed & informed him about Sheila's alog for what to do for next lock.