Ops Shift Transition: 05/17/2019, Owl Shift 07:00 – 15:00 (00:00-08:00) - UTC (PT)
State of H1: Locked
Intent Bit: Observing
Weather: No wind, raining
Primary 0.03 – 0.1Hz: 0.01 um/s
Secondary 0.1 – 0.3Hz: 0.1 um/s
Outgoing Operator: Ed
Quick Summary: Locked for a little over an hour after Georgia did some ADS re-phasing (see alog 49298). DARM looks noisy but we’re holding lock at 109 Mpc.