corey.gray@LIGO.ORG - posted 15:31, Friday 17 May 2019 (49305)
DAY Operator Summary

TITLE: 05/17 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 111Mpc
INCOMING OPERATOR: Jeff
SHIFT SUMMARY:

Observing for the first ~3.5hrs of shift.  Went out to address the high-freq intensity noise by touching up refcav alignment.  Relocking was not trivial (with ALS issues, then ran an alignment, then worked on Dither Line Phasing).  Have tried to record notes of locking in other alogs or below.

Reckon we will have SDF diffs to deal with the next time we are ready for Observing (for possibly ADS/Dither Lines, ASC, SQZ, ALS).

Amber Note:  Ballet group will be walking the site (around 3:45pm) scoping out locations for upcoming event.  May or may not need to visit the Control Room.