corey.gray@LIGO.ORG - posted 15:32, Friday 14 December 2012 (4931)
Day Ops Shift Summary
6.3mag earthquake in Baja Calif at 2:36am
Optical Levers: (Robert, Thomas) Another calibration measurement (cover removed from viewport)
Cheryl/IO checking ifo beam alignment on beam dump at HAM2
Ski swapping prefilters for OSB area (including Optics Lab, Bake Oven Room---Cleanrooms/flow benches will be functioning, but will monitor dust monitors). This took about 10min.
Surprise expressed at ITMy whose Sattelite Box was powered off last night (this was Robert last night for field tests). Satelite box powered back up and ITMy damped.
HAM2 SUS Watchdogs reconnected to SEI HAM2 &3.
Michael & Oliver turned off the laser to do work on the water distribution system