TITLE: 05/26 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 104Mpc
INCOMING OPERATOR: Ed
SHIFT SUMMARY:
First half of the shift was focused on getting H1 back UP & then had a short drop to address the PSL Refcav's drift downward (see alog). Started Jeff's shift with a GRB (& also a coyote sighting...we saw it getting a nice shower in the sprinklers in the back & having a drink from them, too!).
LOG: