Displaying report 1-1 of 1.
Reports until 06:22, Monday 27 May 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 06:22, Monday 27 May 2019 (49471)
Relock After Canadian Earthquake
   Lost lock at 09:57 (02:07) due to mag 5.8 Canadian earthquake. After things settled down enough to relock, had three lock losses at RESONANCE. The BS ISI tripped at the third lock loss, so decided to run an Initial Alignment (11:41 (04:41)). This went well, and required little hand adjustment. Started relocking at 12:07 (05:07). Reached NLN at 13:07 (06:07), and went into Observing at 13:08 (06:08) after clearing SUS TMS-X SDF Diff.    
Images attached to this report
Displaying report 1-1 of 1.