cheryl.vorvick@LIGO.ORG - posted 13:02, Monday 27 May 2019 - last comment - 14:24, Monday 27 May 2019(49474)
OPS Day Mid-Day Update
H1 lost lock, which looks to coincide with a small spike at EY.
Relocking isn't going well - can't get past CHECK-IR
FSS plots attached, because yesterday FSS TRANS PD DC was at 1.9, and now it's at 1.71
I raised the Common gain by 1bB (the amount Georgia did yesterday), and tried relocking, and this did not help, still can't make it past CHECK-IR, keep looking
checked the MC2 pitch alignment through the IM1 baffle, the total span is 330 to 720, and the current value is 550, so it's OK, keep looking
330, light visible on top right of aperture in baffle
720, light visible centered at the bottom fo the aperture in the baffle
it's made it to PRMI, touching up alignment
Images attached to this report
Comments related to this report
cheryl.vorvick@LIGO.ORG - 14:24, Monday 27 May 2019 (49475)