TITLE: 05/30 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC STATE of H1: Lock Acquisition INCOMING OPERATOR: Travis SHIFT SUMMARY: Lock loss at very end of shift. Cause not apparent. Briefly taken out of observing by squeezer near end of shift. SQZ_MANAGER then had user message: 'green power stabilization railed'. Log had it printed at 06:15 UTC. Dust alarm in vacuum prep lab near start of shift. LOG: 22:54 UTC Kyle back from mid Y 06:14 UTC Knocked out of observing by squeezer 06:16 UTC Squeezer automatically relocked. Back to observing. 06:58 UTC Lock loss