Reports until 16:46, Tuesday 18 December 2012
LHO General
gerardo.moreno@LIGO.ORG - posted 16:46, Tuesday 18 December 2012 (4963)
Ops Shift Summary

- tumbleweed baler started at 8:00 am along X-arm.  Baler was moved near the large access door for the LVEA, then to the front of the OSB by late afternoon.
- Unifirst change site mats.
- Ace port a potty drove in a drove out due to tumbleweeds.
- Apollo installated a couple of glass viewports on input tube.
- Removal of FC MC optics, see Betsy's entry below.
- Apollo is installing the East door on HAM03.