TITLE: 06/04 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: Ed
SHIFT SUMMARY:
H1 Locked most of the shift (7hrs40min). Rode through a smallish EQ. Maintenance Time!
LOG:
- 7:25 Back to Observing
- 8:49-8:50 Out of Observing: Squeezer unlocked
- 10:15-10:45 Monitored incoming EQ which was listed in our GREEN/EARTHQUAKE region & no Verbal Alarm given. No action taken/needed on H1.
- 10:42 GRB: Event time 3:42 with H1 & L1, so stand down time until 3:57utc.
- 12:00 Control Room work stations reboot
- 13:51 GRB: Event time 13:51 & stand-down until 14:06utc. Since this is a short GRB of 0.016sec (via https://gcn.gsfc.nasa.gov/other/581349095.fermi).
- 14:40 & 14:50 Lawn & Weed contractor on-site (Desert Green)
- 14:48 -14:55 Weekly PEM Injection---H1 Out of OBSERVING
- 14:55 POP picomotor check (Sheila)