Displaying report 1-1 of 1.
Reports until 16:14, Monday 10 June 2019
LHO General
patrick.thomas@LIGO.ORG - posted 16:14, Monday 10 June 2019 (49792)
Ops Day Shift Summary
TITLE: 06/10 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY: Commissioning for majority of the day. Jenne worked on 37 W. Sheila worked on squeezer measurements. Taking calibration sensing function measurement at end of shift.
LOG:

15:58 UTC Rick and Sundae to optics lab
Jeff B. working in receiving bay, opening rollup door
16:24 UTC Karen to mid Y
16:39 UTC Jeff B. done in receiving bay
16:59 UTC Changed to commissioning mode, Sheila to HAM6 area to start squeezer measurements, Jenne working on increasing power
17:08 UTC Lock loss
17:09 UTC Ed taking car to shipping and receiving
17:16 UTC Jason to optics lab
17:19 UTC Karen leaving mid Y
17:25 UTC Jason back
17:25 UTC SEI_CONF to EARTH_QUAKE
17:43 UTC Kyle to mid Y
18:00 UTC GRB alert (E335886), not locked, ignoring
18:09 UTC Gerardo back from HAM5
18:11 UTC Gerardo to mid X
18:53 UTC Gerardo back
19:06 UTC Kyle back
19:23 UTC Hugh to roof, staying on observation platform
19:28 UTC Hugh back
20:00 UTC GRB alert (E335892), in commissioning, ignoring
20:26 UTC Amber filling LN2 dewar from tank
20:31 UTC Niko and Sundae to laser lab
20:42 UTC Lock loss
21:56 UTC Sheila to HAM6
22:07 UTC Gerardo to mid X
Displaying report 1-1 of 1.