The IOT table, which is currently in the squeezer bay, is ready to go.
All the enclosure panels are now back in place and I have wiped the interior of the enclosure with iso since the table has been exposed for a long time (~ more than a week) because some of the panels had been off. In addition to it, I put some dog-clamps on the two periscope structures, which would otherwise potentially move during the crane business. Also I confirmed that the rest of the parts (i.e. mirror mounnts and etc.) on the table are sufficiently tightened so that they won't move.
Note that the installation of the optics and electronics on the table is ongoing and will be completed after the craning.