H2 General
Link
dani.atkinson@LIGO.ORG -
posted 16:05, Friday 21 January 2011
(500)
Ops Day Shift Summary
Stack was removed from BSC8 and dome placed back.
Oscar baled some tumbleweeds.
Ski and the squeezers craned an ISC table over the X-arm, to be placed in the East Bay laser hazard area.