Reports until 16:01, Tuesday 18 June 2019
LHO General
patrick.thomas@LIGO.ORG - posted 16:01, Tuesday 18 June 2019 (50041)
Ops Day Shift Summary
TITLE: 06/18 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: First day of NSF review. Praxair still working at mid stations. One lockloss from NLN. Relocking.
LOG:

Sheila working on PRMI
15:07 UTC Vanessa to LVEA to clean floors
15:09 UTC Christina taking item to mid X
15:16 UTC Peter to optics lab
15:22 UTC Mark C. through gate
15:22 UTC Chandra to HAM6 area
15:23 - 15:35 UTC Robert to HAM6 area
15:38 UTC Jason to PSL enclosure to move spare PMC
15:39 UTC Filiberto to end stations
15:39 UTC Georgia to optics lab
15:43 UTC Corey to end stations to retrieve laser glasses
16:02 UTC Gerardo to HAM5
16:06 UTC Vanessa to end X
16:10 UTC Bubba to LVEA to look at 3rd IFO parts
16:10 UTC Sheila done
16:12 UTC Marc to LVEA to swap baluns (WP 8244)
16:13 UTC Rahul starting charge measurements
16:20 UTC Georgia, Laurence, Dripta to end Y (WP 8246)
16:21 UTC Jason done
16:28 UTC Karen to end Y
16:28 UTC Corey back
16:31 UTC end Y to laser hazard
16:31 UTC Marc done
16:39 UTC Bubba done
16:46 UTC Unifirst through gate
16:57 - 17:06 UTC Bubba to roof
17:06 UTC Dave to end X to look at timing
17:12 UTC Restarted video2
17:15 - 17:39 UTC Daniel and Maggie to look at squeezer
17:26 UTC Robert to HAM6 and BSC2
17:29 UTC Hugh taking BS to damped
17:30 UTC Hugh powercycling CPS chassis in CER
17:33 UTC Dave back
17:35 UTC end Y charge measurement done
17:36 UTC Karen done at end Y
17:36 UTC end X charge measurement done
18:01 UTC Jim and Hugh to LVEA
18:01 UTC Gerardo done
18:04 - 18:13 UTC Bubba to LVEA to take picture of forklift
18:07 UTC Georgia locking Y arm on green
18:21 UTC NSF reviewer through gate
18:22 UTC NSF tour in control room
18:27 UTC NSF tour to LVEA
18:31 UTC Peter done in optics lab
18:34 UTC Hugh and Jim back
18:45 UTC Country Gentlemen through gate
18:48 UTC Corey to end X to sweep
19:02 UTC NSF tour out of LVEA, going to MSR
19:02 UTC Praxair running long, at end Y for another 15 min
19:12 UTC Georgia done at end Y
19:12 UTC Pepsi truck through gate
19:14 UTC Calum to VPW
19:15 UTC Corey done at end X, heading to end Y
19:16 UTC SEI_CONF to WINDY
19:24 UTC Georgia, Laurence, and Dripta back
19:41 UTC Corey done sweeping end stations
20:27 UTC Corey done sweeping LVEA
20:36 UTC Peter to optics lab
21:31 UTC Niko to optics lab
21:52 UTC Dave restarting mx stream
21:53 UTC Kyle to mid stations to check on Praxair
22:29 UTC Kyle back
22:37 UTC Chandra driving down arms to inspect dewar work