TITLE: 06/18 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Lock Acquisition INCOMING OPERATOR: Jeff SHIFT SUMMARY: First day of NSF review. Praxair still working at mid stations. One lockloss from NLN. Relocking. LOG: Sheila working on PRMI 15:07 UTC Vanessa to LVEA to clean floors 15:09 UTC Christina taking item to mid X 15:16 UTC Peter to optics lab 15:22 UTC Mark C. through gate 15:22 UTC Chandra to HAM6 area 15:23 - 15:35 UTC Robert to HAM6 area 15:38 UTC Jason to PSL enclosure to move spare PMC 15:39 UTC Filiberto to end stations 15:39 UTC Georgia to optics lab 15:43 UTC Corey to end stations to retrieve laser glasses 16:02 UTC Gerardo to HAM5 16:06 UTC Vanessa to end X 16:10 UTC Bubba to LVEA to look at 3rd IFO parts 16:10 UTC Sheila done 16:12 UTC Marc to LVEA to swap baluns (WP 8244) 16:13 UTC Rahul starting charge measurements 16:20 UTC Georgia, Laurence, Dripta to end Y (WP 8246) 16:21 UTC Jason done 16:28 UTC Karen to end Y 16:28 UTC Corey back 16:31 UTC end Y to laser hazard 16:31 UTC Marc done 16:39 UTC Bubba done 16:46 UTC Unifirst through gate 16:57 - 17:06 UTC Bubba to roof 17:06 UTC Dave to end X to look at timing 17:12 UTC Restarted video2 17:15 - 17:39 UTC Daniel and Maggie to look at squeezer 17:26 UTC Robert to HAM6 and BSC2 17:29 UTC Hugh taking BS to damped 17:30 UTC Hugh powercycling CPS chassis in CER 17:33 UTC Dave back 17:35 UTC end Y charge measurement done 17:36 UTC Karen done at end Y 17:36 UTC end X charge measurement done 18:01 UTC Jim and Hugh to LVEA 18:01 UTC Gerardo done 18:04 - 18:13 UTC Bubba to LVEA to take picture of forklift 18:07 UTC Georgia locking Y arm on green 18:21 UTC NSF reviewer through gate 18:22 UTC NSF tour in control room 18:27 UTC NSF tour to LVEA 18:31 UTC Peter done in optics lab 18:34 UTC Hugh and Jim back 18:45 UTC Country Gentlemen through gate 18:48 UTC Corey to end X to sweep 19:02 UTC NSF tour out of LVEA, going to MSR 19:02 UTC Praxair running long, at end Y for another 15 min 19:12 UTC Georgia done at end Y 19:12 UTC Pepsi truck through gate 19:14 UTC Calum to VPW 19:15 UTC Corey done at end X, heading to end Y 19:16 UTC SEI_CONF to WINDY 19:24 UTC Georgia, Laurence, and Dripta back 19:41 UTC Corey done sweeping end stations 20:27 UTC Corey done sweeping LVEA 20:36 UTC Peter to optics lab 21:31 UTC Niko to optics lab 21:52 UTC Dave restarting mx stream 21:53 UTC Kyle to mid stations to check on Praxair 22:29 UTC Kyle back 22:37 UTC Chandra driving down arms to inspect dewar work