Ops Shift Transition: 06/18/2019, Evening Shift 23:00 – 07:00 (16:00 -00:00) - UTC (PT)
State of H1: Locked at NLN
Intent Bit: Locking
Weather: Skies are partly cloudy, with winds running into the mid-teens to lower 20Mph. There is a slight change of rain overnight. The temperatures are ranging from the 90s to the low-60s.
Primary 0.03 – 0.1Hz: X and Y axis 0.1um/s Z axis 0.01um/s
Secondary 0.1 – 0.3Hz: 0.06mu/s
Outgoing Operator: Patrick
Quick Summary: IFO is relocking after the maintenance window. There appears to be a problem with the NLN state completing, which the commissioning team is looking into.