patrick.thomas@LIGO.ORG - posted 16:02, Wednesday 19 June 2019 (50069)
Ops Day Shift Summary
TITLE: 06/19 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: Second day of NSF review. Calibration measurements and noise budget.
LOG:

15:15 UTC NSF reviewer through gate
15:17 UTC NSF reviewer through gate
15:21 UTC NSF reviewer through gate
15:21 UTC NSF reviewer through gate
15:27 UTC Karen leaving mid Y
15:47 UTC Peter to optics lab
Jenne leading tour in control room
16:32 UTC Jenne leading tour out of control room
17:30 UTC Transitioned from WINDY to EARTH_QUAKE for 6.5 magnitude earthquake in Papua New Guinea
Lock loss
17:35 UTC Peter back
17:49 UTC Georgia and Sheila testing PRMI
18:07 UTC Restarted video0
19:35 UTC SEI_CONF back to WINDY
20:05 UTC NLN
20:08 UTC Observing
20:08 UTC Sundae to optics lab
20:31 UTC Apollo through gate
20:34 UTC Running CAL measurements
21:10 UTC Peter to optics lab
21:25 UTC Done CAL measurements
21:37 UTC Georgia running noise budget
22:29 UTC Kyle to mid Y
22:36 UTC Lockloss