yannick.lecoeuche@LIGO.ORG - posted 04:06, Friday 21 June 2019 (50109)
Ops Mid-Shift Summary
Lost lock due to a 6.2 earthquake NE of New Zealand. Once everything had rung down, I noticed on the ALS-Y camera that there appeared to be slight beam clipping. Did an initial alignment, currently re-locking.