Y Arm and Y End status
The baling crew worked on clearing a second lane from the mid-station to the end. The road to the end is passable and both mid and end nitrogen storage tanks are accessible, with turn-around space for trucks. 

Bubba and I checked on the status of preparations for the vinyl installer, who is due on-site tomorrow. The floor in front of BSC6 is clear and ready. 