Reports until 16:12, Tuesday 25 June 2019
LHO General
patrick.thomas@LIGO.ORG - posted 16:12, Tuesday 25 June 2019 (50182)
Ops Day Shift Summary
TITLE: 06/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Full day of maintenance due to vacuum work at mid Y (WP 8250). Maintenance continues at close of shift.
LOG:

15:09 UTC Robert and students to LVEA to set up vibrometer and pull viewport covers (WP 8253)
15:19 UTC Vanessa to end X to clean
15:21 UTC Weed control company through gate
15:22 UTC Fire department through gate for hydrant testing
15:26 UTC Gerardo to mid Y (WP 8250)
15:33 UTC Karen to end Y to clean
15:35 UTC Marc to end stations to swap baluns. Starting at end X. (WP 8255)
15:36 UTC Jeff B. done forklifting (WP 8257)
15:44 UTC Jeff B. to end stations and corner station mechanical room to check HEPI pumps and dust monitor vacuum
15:47 UTC Filiberto to LVEA to swap laser power supply fans (WP 8249)
15:48 UTC Lock loss
15:55 UTC Hugh taking corner station HEPI platforms to OFFLINE (WP 8256)
15:56 UTC Jason adjusting PMC alignment from control room
15:57 UTC Rahul starting charge measurements at end Y
16:00 UTC Hugh checking/charging corner station HEPI fluid accumulators (WP 8256)
16:10 UTC Paradise water through gate
Peter transitioning LVEA to laser safe (WP 8260)
16:15 UTC Seal coat solutions through gate
16:22 UTC Jason done adjusting PMC alignment
16:28 UTC Norco LN2 delivery through gate
16:31 UTC Unifirst through gate
Jeff K. leading tour to LVEA (WP 8251)
16:36 UTC Peter done transitioning LVEA to laser safe
16:37 UTC Karen leaving end Y
16:39 UTC Jeff B. done
16:45 UTC Rahul starting charge measurements at end X
16:47 UTC Marc done swapping baluns at end stations
16:56 UTC Dick G. to CER
17:08 UTC Ray through gate
17:08 UTC Dave to end X
17:11 UTC Peter to optics lab
17:17 UTC Hugh bringing corner station HEPI pump back online
17:19 UTC Karen to LVEA
17:21 UTC Tour done
17:22 UTC Dave starting work at end X (WP 8247)
17:22 UTC Chris to LVEA to start checks on forklifts, etc.
17:24 UTC Marc and Ray to vault (WP 8248)
17:29 UTC end Y charge measurement done
17:45 UTC Rick and company to end X, PCAL
17:56 UTC Filiberto done swapping fan on ALS power supply (WP 8249)
18:02 UTC end X transitioned to laser hazard
18:07 UTC Dave turning off DAQ switch at end X (WP 8247)
18:37 UTC Chris out of LVEA
18:41 UTC Cheryl transitioning LVEA to laser hazard
18:41 UTC Hugh taking end Y HEPI platforms to OFFLINE (WP 8256)
Hugh to end Y
18:55 UTC Jeff B. opening OSB receiving door
18:56 UTC Cheryl done transitioning LVEA to laser hazard
19:03 UTC Rick and company leaving end X to get equipment and break for lunch
19:04 UTC Dave back from end X
19:07 UTC Marc and Ray back from vault. Ray left the site.
19:19 UTC Filiberto and Peter transitioning end Y to laser hazard
19:22 UTC Hugh, Filiberto and Peter leaving end Y
19:35 UTC Dave to end X, adding admin cable to new network switch
19:36 UTC Hugh back from end Y, bringing HEPI back online
19:55 UTC TJ restarting ISC_LOCK guardian
19:57 UTC Filiberto done at end Y
20:06 UTC Chris bringing new dishwasher to OSB with forklift
20:12 UTC Christina driving down arms to get receipts from Norco
20:15 UTC Rick and company back to end X
20:41 UTC TJ taking equipment to LVEA
20:43 UTC Karen to end Y to drop off supplies
20:44 UTC Dave back to end X
20:47 UTC TJ back
20:59 UTC Jeff B. moving equipment into cleaning area
21:00 UTC Gerardo to LVEA to make measurement of HAM5 door
21:10 UTC Peter to optics lab
21:38 UTC Dave done working on switch
21:47 UTC Chris to LVEA to unplug equipment
21:51 UTC Hugh to LVEA to take measurements of HAM chambers for A+ work
22:02 UTC Chris done
22:04 UTC Hugh done
22:18 UTC Marc and Filiberto to LVEA to look at racks
22:21 UTC Jeff B. done
22:36 UTC Cheryl done running transfer functions on IMs
22:55 UTC Marc to LVEA to swap balun (WP 8261)