Displaying report 1-1 of 1.
Reports until 19:14, Tuesday 25 June 2019
LHO VE
chandra.romel@LIGO.ORG - posted 19:14, Tuesday 25 June 2019 - last comment - 18:32, Wednesday 26 June 2019(50188)
mid-y main turbo installation

{Kyle, Gerardo, Chandra}

Installed the first new main turbo pump station on main volume today at mid-y station. All went smoothly. We hard closed GV10 and GV11 and performed a full visual inspection on the actuator per Q1800019 and will make notes in the google sheet.

All vacuum seals are leak tight with the leak checker bottomed out at 1e-10 Torr-L/s of He, except for the manufacturer turbo vent valve which leaked in mid -9 range. We plan to replace those components with blanks and added an after market vent valve on 6-way cross. 

We spun up the turbo and tested a few controls functions. The new three-position switch mod works as intended. The pressure fell to 1e-7 Torr.

This task took most of the day and GVs were closed from about 8:30 am to 4:30 pm. Gerardo and Kyle bumped them open to slowly peel away the o-rings.

The new safety valve is a spring closed, electro-magnetic style, so no more need for instrument air. We found a small air leak in the instrument air line in mechanical room and notified Bubba.

Good work, team!

Work permit 8250 closed.

Images attached to this report
Comments related to this report
chandra.romel@LIGO.ORG - 18:32, Wednesday 26 June 2019 (50221)

Moved foreline pressure gauge past manual scroll valve.

Images attached to this comment
Displaying report 1-1 of 1.