Reports until 16:00, Wednesday 26 June 2019
LHO General
patrick.thomas@LIGO.ORG - posted 16:00, Wednesday 26 June 2019 (50216)
Ops Day Shift Summary
TITLE: 06/26 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Calibration
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Georgia and Jenne worked on commissioning. Robert worked on PEM. Jeff currently taking calibration measurements.
LOG:

15:22 UTC Heard plane flying over site
16:16 UTC Sundae to optics lab
16:17 UTC Ken to communication room
16:29 UTC S&K electric, replacing emergency light fixtures (WP 8262)
17:58 UTC Karen to mid Y
18:06 UTC Observatory mode to commissioning
18:16 UTC Ken to change room to add a light
18:17 UTC Robert, Matthew, and Adrian to LVEA to start PEM work
18:19 UTC Vanessa to mid X
18:24 UTC Ken to air handler room
18:41 UTC Karen leaving mid Y
18:43 UTC Set SEI_CONF to EARTH_QUAKE
19:25 UTC Lock loss
19:30 UTC GRB E337158. Confirmed with LLO. Unlocked, ignoring.
19:34 UTC Set SEI_CONF to WINDY
20:27 UTC Dave to end Y
20:55 UTC Dave back
21:03 UTC Kyle to mid Y
21:48 UTC Observatory mode to calibration
22:58 UTC Chandra to mid Y