Displaying report 1-1 of 1.
Reports until 18:17, Wednesday 26 June 2019
H1 CAL (ISC)
jeffrey.kissel@LIGO.ORG - posted 18:17, Wednesday 26 June 2019 (50219)
Calibration Measurements Today: Everything Measured: A, C, Plus Complements with PCALX
J. Kissel

I gathered the following regular calibration measurements today; in summary -- the full suite. I was also able, during the sensing function portion of the measurements, to grab complementary PCALX sweeps and broadband measurements as well to further facilitate studies of the apparent a-causality of the detuned SRC spring. Total measurement time was 3.1 hours.


/ligo/svncommon/CalSVN/aligocalibration/trunk/Runs/O3/H1/Measurements/FullIFOSensingTFs/
2019-06-26_H1_DARM_OLGTF_LF_SS_5to1100Hz_15min.xml     # 1/(1+G)
2019-06-26_H1_PCALX2DARMTF_LF_SS_5t1100Hz_10min.xml    # C_x/(1+G)
2019-06-26_H1_PCALY2DARMTF_LF_SS_5t1100Hz_10min.xml    # C_y/(1+G)
2019-06-26_H1_PCALX2DARMTF_BB.xml                      # from 2019-06-27 00:52:26 - 00:54:09
2019-06-26_H1_PCALY2DARMTF_BB.xml                      # from 2019-06-27 00:49:25 - 00:51:09
2019-06-26_H1_OMCDCPDSUM_to_DARMIN1.xml                # TF to roughly convert units from DARMIN1 ct to OMC DCPD current

/ligo/svncommon/CalSVN/aligocalibration/trunk/Runs/O3/H1/Measurements/FullIFOActuationTFs/
2019-06-26_H1SUSETMX_L1_iEXC2DARM_10min.xml           # A_L1*C_y / (1+G)
2019-06-26_H1SUSETMX_L1_PCAL2DARM_8min.xml            # C_y / (1+G) for L1
2019-06-26_H1SUSETMX_L2_iEXC2DARM_22min.xml           # A_L2*C_y / (1+G)
2019-06-26_H1SUSETMX_L2_PCAL2DARM_8min.xml            # C_y / (1+G) for L2
2019-06-26_H1SUSETMX_L3_iEXC2DARM_8min.xml            # A_L3*C_y / (1+G)
2019-06-26_H1SUSETMX_L3_PCAL2DARM_8min.xml            # C_y / (1+G) for L3

Analysis to come.
Displaying report 1-1 of 1.