The power watchdog on the frontend tripped last night, shutting down the laser. This appears to be due to a change in humidity affecting the pickoff power, as we have seen before. The laser power recorded by AMP_PWR3 read 91% when the watchdog was turned on, and decreased by 15% to 77% to trip the power watchdog. The power recorded by OSC_PD_AMP_DC_OUTPUT had decreased by about 250mW during this time, or 0.8%
The laser is still off as we try to move over to the final RF configuration.
The power watchdog on the frontend tripped last night, shutting down the laser. This appears to be due to a change in humidity affecting the pickoff power, as we have seen before. The laser power recorded by AMP_PWR3 read 91% when the watchdog was turned on, and decreased by 15% to 77% to trip the power watchdog. The power recorded by OSC_PD_AMP_DC_OUTPUT had decreased by about 250mW during this time, or 0.8%
The laser is still off as we try to move over to the final RF configuration.